Project Value: £60k
Part of a new build energy plant facility, Ultra Surefire designed and installed a deluge application cooling system to protect the external LPG storage tank. The system was supplied with dry pilot line actuation using closed bulb sprinkler heads linked to the deluge valve and open spray nozzles.
The system was fed via the existing water storage fire system installed by Ultra Surefire under a separate contract, a new dedicate 100mm main was run to feed the deluge valve housed local to the risk and connected to the in house alarm system.